  • Planning Criteria [WDS O5.5]: Water Distribution Main Replacement & PRV Setting Optimization w/ Fire-Flow Considerations
    General Project Background: This planning criteria example is based on a utility that was utilizing Optimizer WDS to determine the optimal pipe size configuration and pressure reducing valve settings to implement as a part of their organization's broader Capital Improvment Plan (CIP). The engineers wanted to consider designs that would be able to maintain the appropriate velocities and pressures under both standard and fireflow conditions assessed at hydrants throughout the network model. WFew readers

Not finding what you are looking for?

Chat with us or send us an email.

  • Chat with us
© 2025 OptimaticsWe run on Crisp Knowledge.