Planning Criteria [WDS O5.5]: Water Distribution Main Replacement & PRV Setting Optimization w/ Fire-Flow Considerations

General Project Background:
This planning criteria example is based on a utility that was utilizing Optimizer WDS to determine the optimal pipe size configuration and pressure reducing valve settings to implement as a part of their organization's broader Capital Improvment Plan (CIP). The engineers wanted to consider designs that would be able to maintain the appropriate velocities and pressures under both standard and fireflow conditions assessed at hydrants throughout the network model.

Watch the video below for a walk through of the Planning Criteria component of the formulation. An Optimatics Strategic Support Team (SST) member will explain the process as well as the strategy used to implement it for this specific use case. For more detailed documentation on Planning Criteria for the Optimizer WDS integration module, please visit this link or contact one of our SST representatives through the Crisp chat window.

Updated on: 07/06/2022

Was this article helpful?

Share your feedback

Cancel

Thank you!