Articles on: Decisions (Stategic)

Pipe Decision (Scripted) [WDS O5.5]: Water Distribution Main Replacement & PRV Setting Optimization w/ Fire-Flow Considerations

General Project Background:
This decision example is based on a utility that was utilizing Optimizer WDS to determine the optimal pipe size configurations to implement as a part of their organization's water mains replacement plan within the broader Capital Improvment Plan (CIP). The engineers wanted to consider a range of pipe sizes for non-dead-end service lines, and the design needed to be tested under fireflow conditions assessed at hydrants throughout the network model.

Watch the video below for a walk through of the Pipe Decision (Scripted) component of the formulation. An Optimatics Strategic Support Team (SST) member will explain the decision as well as the strategy used to implement it for this specific use case. For more detailed documentation on the Pipe Decision (Scripted) for the Optimizer WDS integration module, please visit this link or contact one of our SST representatives through the Crisp chat window.

Updated on: 07/06/2022

Was this article helpful?

Share your feedback

Cancel

Thank you!